250 bhp horizontal water boiler manufacturers
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
GPM = Gallons Per Minute - GPM is a measure of how many gallons of water flow out of your system each minute. BHP = Boiler Horsepower - The boiler's capacity to deliver steam to a system. LB / HR = Pound per hour - Mass flow rate. It is particularly useful when dealing with gases or liquids, as volume flow varies more with temperature and Get Price
In commercial or industrial boiler installations, boilers are rated based on their square feet of heating surface. Packaged boilers today are commonly rated on the basis that 5 sq. ft. of heating surface will produce 1 boiler horsepower, or 33, 500 btu of useful heat, and some claim even less surface required per BHP.Get Price
In commercial or industrial boiler installations, boilers are rated based on their square feet of heating surface. Packaged boilers today are commonly rated on the basis that 5 sq. ft. of heating surface will produce 1 boiler horsepower, or 33, 500 btu of useful heat, and some claim even less surface required per BHP.Get Price
11.43 cm of water. 11. A fan described in a manufacturers table is rated to deliver 500 /min at a static. pressure (gage) of 254 cm of water when running at 250 rpm and requiring 3.6 kW. If the fan speed is changed to 305 rpm and the air handled were at 65. instead of. standard 21, find the power in kW. a. 3.82. c. 4.66. b. 5.08. d. 5.68 Get Price
13. A water tube boiler has a capacity of 1000 kg/hr of steam. The factor of evaporation is 1.3, boiler rating is 200%, boiler efficiency is 5%, heating surface area is 0.91 m 2/boiler Hp, and the heating value of fuel is 18,400 Kcal/kg. The total coal available in the bunker is 50,000 kg. Determine total number of hours to consume the Get Price
13. A water tube boiler has a capacity of 1000 kg/hr of steam. The factor of evaporation is 1.3, boiler rating is 200%, boiler efficiency is 5%, heating surface area is 0.91 m 2/boiler Hp, and the heating value of fuel is 18,400 Kcal/kg. The total coal available in the bunker is 50,000 kg. Determine total number of hours to consume the Get Price
11.43 cm of water. 11. A fan described in a manufacturers table is rated to deliver 500 /min at a static. pressure (gage) of 254 cm of water when running at 250 rpm and requiring 3.6 kW. If the fan speed is changed to 305 rpm and the air handled were at 65. instead of. standard 21, find the power in kW. a. 3.82. c. 4.66. b. 5.08. d. 5.68 Get Price
GPM = Gallons Per Minute - GPM is a measure of how many gallons of water flow out of your system each minute. BHP = Boiler Horsepower - The boiler's capacity to deliver steam to a system. LB / HR = Pound per hour - Mass flow rate. It is particularly useful when dealing with gases or liquids, as volume flow varies more with temperature and Get Price