khabarovsk hot water boiler and steam boiler

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :khabarovsk hot water boiler and steam boiler
  • Supply Capacity : 10 units/month :khabarovsk hot water boiler and steam boiler
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

Get display discount

Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • At the "Severnaya Verf" told about the consequences of the

    Dec 19, 2021 · Very quickly, the flame reached power compartment No. 1, where an auxiliary boiler and a turbine generator were working - the ship was de-energized. The situation was aggravated by the fact that the autonomous fire extinguishing system in the burning compartments was faulty, the fire main did not work without electricity, and it was not Get Price

  • At the "Severnaya Verf" told about the consequences of the

    Dec 19, 2021 · Very quickly, the flame reached power compartment No. 1, where an auxiliary boiler and a turbine generator were working - the ship was de-energized. The situation was aggravated by the fact that the autonomous fire extinguishing system in the burning compartments was faulty, the fire main did not work without electricity, and it was not Get Price

  • At the "Severnaya Verf" told about the consequences of the

    Dec 19, 2021 · Very quickly, the flame reached power compartment No. 1, where an auxiliary boiler and a turbine generator were working - the ship was de-energized. The situation was aggravated by the fact that the autonomous fire extinguishing system in the burning compartments was faulty, the fire main did not work without electricity, and it was not Get Price