boiler Agent parts waste oil burner
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
Jun 21, 2012 · Boiler Presentation 1. By- Mukesh Jha Sr.Engineer -Projects, a2z Powercom Pvt.Ltd. 2. Boiler- As per "THE INDIAN BOILERS(AMENDMENT ) ACT2007 A 'Boiler' means a pressure vessel in which steam is generated for use external to itself by application of heat which is wholly or partly under pressure when steam is shut off but does not include a pressure …Get Price
Oil-Fired Boiler Assemblies: UL 727: Oil-Fired Central Furnaces: UL 729: Oil-Fired Floor Furnaces: UL 730: Oil-Fired Wall Furnaces: UL 731: Oil-Fired Unit Heaters: UL 732: Oil-Fired Water Heaters: UL 733: Oil-Fired Air Heaters and Direct-Fired Heaters: UL Kefid: Particular Requirements for Grinders, Polishers, and Disk-Type Sanders: UL KefidGet Price
Sends an 'enable' signal back to the boiler to activate it, if it is not already firing Ambiente supply wiring centres for 230v, 12v and Wireless systems. Some more simple systems with a single zone can be controlled without a wiring centre or individual actuator valves on each loop – the wiring can be set up from the 'back-end Get Price
Sends an 'enable' signal back to the boiler to activate it, if it is not already firing Ambiente supply wiring centres for 230v, 12v and Wireless systems. Some more simple systems with a single zone can be controlled without a wiring centre or individual actuator valves on each loop – the wiring can be set up from the 'back-end Get Price
The product stream is fed to the waste heat boiler. The product stream is then separated into sulphur and other product streams. The remaining product enters the catalytic step made of three reactors as shown in Figure E15.11. Each reactor operates at 240 °C; therefore, a heater is placed before each reactor. Simulate the process on the UNISIM Get Price